Case studies
Delta Electronics Beijing Office, China, 2017
The U.S. Green Building Council (USGBC) has just granted the LEED NC (New Construction) Silver Certification to Delta Electronics’ Beijing Office. Delta’s Beijing office has demonstrated an impressive 20% cut in overall energy costs as compared to the annual baseline reference of the 2007 ASHREA standard 90.1.
肇慶インターシティステーション(中国肇慶市、2016)
マンチェスター空港(イギリス・マンチェスター、2016)
After the successful implementation of a lighting control system for the public areas of Manchester Airport's terminal 2, the LOYTEC Competence Center Calon in cooperation with the company Building Environment Control, have now extended the very same lighting control solution to the public areas of the airport’s terminals T1 & T3.
コンティネンテハイパーマーケット Nova Arcada (ポルトガル・ブラガ、2016)
The LOYTEC Competence Partner RACE installed a total control solution for the Continente Hypermarket, Braga Nova Arcada based on LOYTEC components. The solution integrates all systems of the store from refrigeration to HVAC and lighting and allows for increased energy efficiency and transparent management of the technical equipment.
王立オーストラリア空軍ピアース基地(オーストラリア・パース、2016 )
The Royal Australian Air Force Base is located in Perth, Western Australia, and is one of the largest LOYTEC sites in Australia. The LOYTEC Competence Partner Building Control Systems introduced the LOYTEC system to the Australian Defence Force, when an upgrade and a standardisation to more common technologies and communication platforms were required.
NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015
University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015
PAMA west al jahra branch, Kuwait, 2015
Another PAMA branch, the seat of the public authority of minority affairs in Kuwait was automated by the LOYTEC Competence Partner Ahmed Isaq Co. However, this building is more advanced than the other branch, fahd al ahmad, as additionally L-DALI lighting control is used for all building offices and corridors.
District Office Sigmaringen, Germany, 2015
At the end of 2014, the extension of the district office in Sigmaringen, Germany was completed. The four-storied office building with 8,300 m2 accommodates 190 employees.
AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015
The AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.
Hotel Management School Belvoirpark, Switzerland, 2015
PentaControl AG implements the building management system for the hotel management school Belvoirpark, Switzerland’s most modern hotel management school! LOYTEC’s intelligent BMS LWEB-900 ensures the perfect control of heating and cooling, ventilation, and also room ambiance.
Fire Directorate, Kuwait, 2015
The Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components.
Penal Institution Schwerte, Germany, 2015
The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte.