City Tower and Kubus Offenbach, Germany
The City Tower and the adjacent Kubus are equipped with cutting edge building technology. The network infrastructure is made up of devices by LOYTEC.
The City Tower and the adjacent Kubus are equipped with cutting edge building technology. The network infrastructure is made up of devices by LOYTEC.
New high-rise Ernst & Young Center in Sydney, Australia comprises the main tower of 44 levels offering minimum A grade quality accommodation. The building benefits from a central core with full height double glazed windows, allowing excellent natural light and views from the upper levels to all elevations.
The 'ESPRIT Arena Düsseldorf' is one of the most modern multi-purpose stadiums in Europe.
The building automation of the newly reorganized and extended federal school center in Wörgl was implemented with LOYTEC devices.
The new office tower of Dresdner Bank in Frankfurt has 38 floors and offers approximately 30,000 square meters of office space.
In the course of renovating the hospital in Rohrbach, Austria, CEA-709 was implemented as the building control system.
With the head office of Italy’s leading financial journal ‘Il sole 24 ore’, a building complex with more than 1,200 office and conference rooms and a surface area of 48,000 m² arose.
For HVAC and streetlight control at the International Horticultural Exposition 2006, located in Shenyang, China, LOYTEC tools and infrastructure components were used.
One of the most complex CEA-709 installations in Europe was realized in the new building of the KfW (Kreditanstalt für Wiederaufbau) Frankfurt by the ARGE KfW-MSR.
The building of the ‘Landesbank Baden-Württemberg LBBW’ with a surface area of 58,000 m² is located 300 meters away from the central station of Stuttgart, Germany. The most important goal was to create a comfortable room climate for the employees and at the same time keep the operating costs low.
For the largest-ever cruise ship 'Oasis of the Seas', LOYTEC’s L-IP Redundant CEA-709/IP router was chosen to set up an IP-852 (Ethernet/IP) channel as a backbone for high speed communication.
The network infrastructure of the retirement community Wörgl is built up out of network infrastructure components from LOYTEC.
New building of Royal Netherlands Embassy in Berlin, Germany.
The Wangjing International Commercial Center, approximately 120,000 square meters, is located in the famous Wangjing area, which is the largest modern residential area of Beijing, China.
Jaarbeurs Utrecht is the place to meet in the Netherlands. Whether it is for a short meeting, a congress of several days, a trade fair, or any other event, Jaarbeurs Utrecht offers the appropriate facilities and services.
The 'Landesmesse Stuttgart' is a state-of-the-art showground with architectural and functional convincing buildings. A widely ramified CEA-709 network takes care of lighting and shading.