Fire Directorate, Kuwait, 2015
The Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components.
Penal Institution Schwerte, Germany, 2015
The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte.
Rheinwerk 3, Bonn, Germany, 2015
Rheinwerk 3 is a premium office facility located in the former German capital Bonn. Kieback & Peter used LOYTEC product solutions to implement a DALI lighting control system and to provide operations for the conference rooms and for the rooms via desktop PCs.
Osceola County Health Department, Poinciana, Florida, 2014
Osceola County Health Department is a five million dollar medical facility in Florida. For the control of the HVAC system of the building, the LOYTEC Competence Partner Total Building Integrations Inc. installed an ALL-IP BACnet system with LOYTEC components.
Continente Hypermarket, Matosinhos, Portugal, 2015
The LOYTEC Competence Partner RACE implemented a new building management system using the latest technology of LOYTEC in the Continente Hypermarket in Matosinhos, Portugal.
Hypermarket in Alor Setar - Kedah, Malaysia 2014
The LOYTEC partner M&C Engineering and Trading Sdn Bhd implemented a project for a new hypermarket in Alor Setar - Kedah, Malaysia. There, LOYTEC’s powerful LINX-110 Automation Servers extended with L-IOB I/O Modules are in charge of controlling and monitoring the hypermarkets’ systems.
Quartier 17, Hanseatic City Stralsund, Germany, 2014
A project of the LOYTEC Competence Partner Dr. Diestel regarding control and visualization of different room air conditioning systems of the newly built Quartier 17 in the Hanseatic City Stralsund in Germany.
Heatherbrae Elementary School, Arizona, USA, 2014
The LOYTEC Competence Partner Mechanical Products BAS (MPBAS) implemented in conjunction with the manufacturer DeVenthere Industries a fully integrated, demand controlled ventilation and heat recovery system (DVHR) with added free cooling capability meeting the ASHRAE standards 189.1 and 62.1 for Heatherbrae Elementary School.
Camões Building, Porto, Portugal, 2014
The Camões Building is used as headquarters of the Court of Criminal Investigation (ICT) and the Department of Investigation and Penal Action (DIAP). The LOYTEC Competence Partner RACE implemented the project with LOYTEC equipment. The project comprises the refurbishment of the building including maintenance and conservation work.
Shopping Center Allegro, Setúbal, Portugal, 2014
The shopping center Allegro Setúbal resulted from a Jumbo hypermarket enlargement. The integrated building automation solution was developed and installed by the LOYTEC Competence Partner RACE and is controlled and monitored by LOYTEC components.
Hospitals Senhor do Bonfim, Portugal, 2014
The private health care institution „Hospitals Senhor do Bonfirm“ (HSB) is equipped with modern and innovative facilities at national and European level that were built with excellent materials. Many of them are used for the first time in Portugal. The systems for building automation were installed and implemented by the LOYTEC system integrator RACE.
Hotel Royal Óbidos, Portugal, 2014
The five-star Evolutee Hotel is located in the western region of Portugal. Only materials and techniques that meet environmental standards were used for the construction of the building, along with the efficient technology of LOYTEC that was implemented by the LOYTEC systems integrator RACE.
RMZ Galleria, Bangalore, India, 2014
The retail, office, and hotel block "Galleria" in India receives a comprehensive BMS solution from the LOYTEC systems integrator Venba Tech, including monitoring an controlling of air handlers, ventilation and plumbing system, and lighting.
Maintenance facility Herdern, Zurich, Switzerland, 2014
Swiss Federal Railways (SBB AG) extended the maintenance facility Herdern at the Herdern-Areal in Zurich-Altstetten to one of the most modern maintenance facilities for service and repair work. PentaControl AG was entrusted by the general contractor Allreal AG with the complete building automation, whereby it applied latest technologies.
Raiffeisenbank, Lieboch-Stainz, Austria, 2013
A sustainable and comprehensive renovation of a bank branch, considering ecological, economical, and social aspects, carried out by the LOYTEC systems integrator EAM Systems GmbH.
AKDR Tower, Chennai, India, 2013
The Indian LOYTEC systems integrator Venba Tech implemented the building management software for the AKDR Tower, an IT building in Chennai that mainly houses information technology companies.
Passeio das Águas Shopping, Brazil, 2013
In the "Passeio des Aguas Shopping", a newly built shopping center in Goiânia, Brazil, the LOYTEC systems integrator RACE installed HVAC, lighting, and energy metering systems, controlled and monitored by LOYTEC components.>
Manchester Airport, Manchester, Great Britain, 2013
The LOYTEC systems integrator Calon in cooperation with the company Building Environment Control integrated a modern DALI lighting system with constant light control and occupancy detection in the Manchester Airport, terminal 2.
Parc Hotel Alvisse, Dommeldange, Luxembourg, 2013
The PARC HOTEL ALVISSE**** was equipped with the latest technology in the course of a total renovation. L-INX Automation Servers, L-VIS Touch Panels and L-IP Routers of LOYTEC were installed that are now responsible, among other things, for visualization and integration of the indivudual room controllers of the hotel rooms.
COWI Headquarters, Copenhagen, Denmark, 2013
COWI is one of the largest consultant engineering companies in Denmark. Its headquarters is situated in Kongens Lyngby just outside the center of Copenhagen. In course of a total renovation of the building it was necessary to implement a Building Management System for ventilation, heating, and lighting.
"The Warehouse", Copenhagen, Denmark, 2013
“The Warehouse” in Copenhagen is a new office building for different tenants. The new building needed an appropriate automation system for automating the functions of ventilation, heating/cooling, and lighting.